Kings Lynn College of West Anglia
System; Tapered Sto EPS insulation adhered and mechanically fixed to existing structure to provide a flat façade finish providing a 50mm minimum cover at the external apex of the orignal concrete panels. Reinforced mesh basecoat and acrylic topcoat.
Scope; using the latest EPS cutting machinery, all tapered EPS boards where formed on-site prior to cladding the tower block to form the new façade. Each elevation was then basecoat rendered using machine pumped application techniques by our team of trained operatives over the 30m height of the building before an acrylic topcoat was applied to achieve the final appearance. This major refurbishment project highlights what is possible with modern external wall insulation (EWI) and render systems and exceeded all expectations of both the client and main contractor.)