Dublin Airport
System: 120mm rockwool insulation mechanically fixed to concrete structure and SFS infill sections with Weber LAC and glass fibre mesh embedded basecoat, primer and Weber TF decorative topcoat.
Scope: Some 1200m2 installed over a tight 8week programme coordinated alongside the concrete structure erection, our team utilised MEWPs and machine application techniques to complete the multi-storey car park at Terminal 2 Dublin Airport.)